|
---Heavy
Equipment
Accelerate the realization
of localization of design and manufacturing of whole of set equipment
for large panel hot/cold tandem rolling and deep processing equipment
and upgrade the whole set technological equipment manufacturing
capacity. Priority is given to development of heavy coal liquefaction
and petrochemical equipment, heavy vessels for hydrogenation reactor
and nuclear reactor and localization of heavy casting and forging
for super-critical unit.
---Generating
Equipment
Consolidate the
advantages of hydropower and thermal power units and make breakthrough
in key technologies of gas, wind and nuclear power units in order
to realize localization of these technologies. Develop and manufacture
large pumped storage units, large tubular turbine units, high-power
super-critical thermal power unit, large air-cooled turbine generator,
large CFB boilers, high-power nuclear steam turbine and generator,
pressure shell of nuclear island, high-pressure evaporator and
primary pump. Realize localization of IGCC generator unit and
heavy gas turbine.
---Engineering
Machinery
Give priority to develop and manufacture full-face excavator,
large-tonnage hydraulic excavator, heavy-tonnage loader, auto
crane series, medium and small tonnage and multifunctional loaders.
Develop and manufacture high-capacity diesel-driven and electrically
driven hydraulic excavator so as to realize and mechatronics and
hydraulics integration and intelligentization.
---Further integration in
environmental equipment, whole set of petroleum and gas equipment,
track traffic equipment, automobile and critical auto parts, digital
control equipment; promote industrial concentration and social
coordination and grasp core technology to own independent intellectual
property rights. |